Annual Report design question...
Annual Report design question...
Out of context: Reply #6
- Started
- Last post
- 13 Responses
- ksv1230
I would guess that could be a 1-2month project, are you solo on it?
- Yeah, all by myself on this one. Though it might be my fault for not letting them know at an AR takes a good while to produce. It was my job to let them know, but I wanted to seem like a super hero I guess. + I lost my job when it came through so I couldn't turn it down though the timeline was super tight.
ohhhhhsnap
- Yeah, all by myself on this one. Though it might be my fault for not letting them know at an AR takes a good while to produce. It was my job to let them know, but I wanted to seem like a super hero I guess. + I lost my job when it came through so I couldn't turn it down though the timeline was super tight.