Ramp
Ramp
Out of context: Reply #15
- Started
- Last post
- 34 Responses
- rson0
I think we should strike until all companies have at least a 5ft half pipe with steel coping on one side an concrete pool coping on the other.
I think we should strike until all companies have at least a 5ft half pipe with steel coping on one side an concrete pool coping on the other.