how much
how much
Out of context: Reply #6
- Started
- Last post
- 15 Responses
- ********0
The biggest chunk of work will be the CMS. Then what interface you have that draws from it.
You mentioned flash, so the work involved in getting a flash site to work well wiht a CMS could range from 'piece o piss' to 'fucking nightmare' depending on what is done.
I would get the coding buddy to look at coming back to you with times on the CMS and the front end build, then you work out how long it will take for the actual interface design work.
After that, get the times together, add abother 40-50 for things overlooked and the sheer cost of stiching everything together and voilia, that should be pretty close.