design shake up
design shake up
Out of context: Reply #16
- Started
- Last post
- 16 Responses
- blastofv0
usually 6-8 projects that require a half days work minimum, and the rest are smaller but more urgent.
the small stuff interrupts the larger projects, and everything suffers as a result. time is all whacked out here, and an average turnaround for creative concepts is 2 days. I'm lucky if I can dedicate a few hours in a row to anything.
and I'm out of here once the right pieces fall into place with the rest of my life/family/geography etc...so I'm hunkered down for now