better than you
Out of context: Reply #24
- Started
- Last post
- 37 Responses
- cwoodside0
Okay, so I have my login fixed. Anyway if I understand you correctly there is only 15 minutes of footage split to 3 sections. All you would need to do is relog these clips (the 15 minutes), name them the same as before and drop them in your capture scratch file. Then in your timeline click on the clips that display "Unlinked media" (or something like that). Final Cut will either then find what it thinks could be the video file missing or allow you to direct it to the proper video clip. Do this with all the missing clips, your transitions, cuts, effects and such should be maintained. At this point all you should have to do is render or output the movie again. FCP is built to be a very non-destructive editor. And does take great pains to protect the user. Hope I was able to help.