blog

Out of context: Reply #56422

  • Started
  • Last post
  • 75,599 Responses
  • e-pill0

    the rain that started the flood [video]
    http://edd-e.com/china/the_rain_…

    the hotel lobby river entrance [video]
    http://edd-e.com/china/hotel_lob…

    the car take 1

    the car take 2

    the car take 3

    the car take 4

    welcome to CHINA FUQing CITY [video]
    http://edd-e.com/china/welcome_t…

    the clean-up crew has arrived [video]
    http://edd-e.com/china/the_clean…

    :)

    • wow, ed... be safe... that's just insanePonyBoy
    • i wish i can show you the other videos, i took 73 in total but the others are over 500megs eache-pill
    • these were the only small files.
      it was insane.. when the power went out there was chaos!!
      e-pill
    • worst part is i met a cutie last week and wanted to take her out to dinner at the hotel n stuffe-pill
    • now the hotel is fucked!!
      there goes my date!!!
      e-pill
    • the hotel does have a boat, its like the Pirates of the Caribbean ride in Disneylande-pill
    • maybe they can give us a tour of the muddy water surrounding the hotel so i can make oute-pill
    • damn e that nutsmoldero
    • you call it flood. they call it "little lain"pango
    • craziness!inteliboy
    • Damn Eddie! You got cockblocked by a flood!BuddhaHat
    • the hotel is back to normal.. strange.. if this was in america it would still be a mess for monthse-pill
    • that bag better be bitchin' gooddrgs
    • "that bag" haha.. i developed 250 backpacks in the last 4 weeks.. oie-pill
    • close to 1/2 of them are opening price point but the id say 45 of them are dopeness!!e-pill
    • 1 bag per hour in 12 hour shifts, e-pill, please tell me you are designing, not sewing these bagsdrgs
    • sound like a sweat shop...pango
    • yes, i design/ spec, the factory develops the samples. we have our own sample room.e-pill
    • its not a sweatshop, the factory workers actually get a lot of breaks and long ones at that.e-pill
    • they start 8am -9pm. from 11:30am-2pm is their lunch from 5:30pm-7pm is their dinnere-pill
    • the sample room will develop anything i can think of.. it usually takes 2 days to make-e-pill
    • -one sample complete. sometimes it takes 3 days per backpack.e-pill
    • my sample room has 12 pattern makers, 15 cutters, and 50 developers.. so we can make-e-pill
    • on average with no changes opening price and 2nd price point we can make 10 in 3 dayse-pill
    • if the bags are mid level to upper price, it will take longer, on average 5 bags in 3 dayse-pill
    • i average from concept to final spec 2 per day with each spec having 10-15 pages of info.e-pill
    • this includes, colour blocking, choosing fabric, creating hardware, orthogonal views,e-pill
    • detail pages, interior pages, breakdown of construction and paper pattern on 1-1 scale.e-pill

View thread